#1. First 60 minutes — make safe assessment
A structural engineer reaches site within 60 minutes, declares the residual structure stable or unstable, and defines the exclusion zone with Civil Defence.
#2. Hour 1 to 24 — mobilisation
Long-reach excavator, breaker and water bowser on site within 6–12 hours in Dubai, 12–24 hours up-country. Continuous shift working until the structure is stable.
#3. Authority interface
Civil Defence retains command during the response. Emergency demolition experts integrate with the incident commander — they do not run a parallel show.
#4. Documentation under pressure
Every emergency decision is logged, photographed and timestamped for the post-incident insurance and authority report. This protects the owner long after the response.
#5. Post-emergency permanent demolition
Once the structure is safe, the project converts to a normal demolition with full permit and isolation routine — but the emergency phase has already removed the immediate risk.
#6. USF emergency capability
24/7 incident phone line, structural engineer on call, long-reach and breaker fleet positioned across Dubai, Sharjah and Abu Dhabi. Insurance-grade documentation supplied.